Pole height: 5ft
Distance between poles: 3ft
Surface subject to wind: 48’’x26’’ = 8.67 sft

Pole profile: C5x6.7 Galvanised C channel
Foundation Pile: 12’’ diameter concrete and 4’ depth

The I-64 Roads Bridge-Tunnel in southeastern Virginia, between the cities of Hampton and Norfolk, has long been one of the most congested corridors of the region. The existing 3.5-mile facility consists of two, 2-lane immersed tube tunnels on artificial islands with trestle bridges to shore.

These tunnels opened in 1957 (current westbound lanes) and 1976 (eastbound lanes) and are approximately 7,500 feet long. The Hampton Roads Bridge-Tunnel (HRBT) Expansion Project will ease this congestion by widening the 4-lane segments of the I-64 corridor in the cities of Hampton and Norfolk.

As part of the CYMI North Shore Power Project, CYMI Industrial have asked AZIERTA for a structural calculation of the design of the rack supports, considering the most adverse case for the structural calculations of both of the rack supports.