SOUTH TRESTLE MOT EASTBOUND
Hampton Roads Bridge-Tunnel Expansion (HRBT)
SUMMARY
Beams: W36x232 ASTM A36 Bracing System: L4”x4”x1/2” and PL 5/8” ASTM A36
Concrete Piers: 55x30 inches Concrete Footing: 7.00x5.50x2.00 inches
The I-64 Roads Bridge-Tunnel in southeastern Virginia, between the cities of Hampton and Norfolk, has long been one of the most congested corridors of the region. The existing 3.5-mile facility consists of two, 2-lane immersed tube tunnels on artificial islands with trestle bridges to shore. These tunnels opened in 1957 (current westbound lanes) and 1976 (eastbound lanes) and are approximately 7,500 feet long.
The Hampton Roads Bridge-Tunnel (HRBT) Expansion Project will ease this congestion by widening the 4-lane segments of the I-64 corridor in the cities of Hampton and Norfolk.
As part of the Hampton Roads Bridge Tunnel Project, Hampton Roads Connector Partners have asked AZIERTA for the Relocation VDOT MV and SCADA utilities for CYMI Industrial.