OVERHEAD LINE POLE CALCULATION S3 WB WILLOUGHBY

Hampton Roads Bridge-Tunnel Expansion (HRBT)

SUMMARY

ASSHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals.
VDOT Memorandum IIM-S&B-90.2.

The I-64 Roads Bridge-Tunnel in southeastern Virginia, between the cities of Hampton and Norfolk, has long been one of the most congested corridors of the region. The existing 3.5-mile facility consists of two, 2-lane immersed tube tunnels on artificial islands with trestle bridges to shore. These tunnels opened in 1957 (current westbound lanes) and 1976 (eastbound lanes) and are approximately 7,500 feet long.

The Hampton Roads Bridge-Tunnel (HRBT) Expansion Project will ease this congestion by widening the 4-lane segments of the I-64 corridor in the cities of Hampton and Norfolk. As part of the HRBT Expansion Project CYMI Industrial asked AZIERTA for a design of the Temporary Relocation of VDOT MV and SCADA utilities.

CYMI Industrial asked Azierta calculations and detailed design, for concrete foundations for overhead poles.